計算依據:
1、《建築基坑支護技術規程》JGJ120-2012
2、《建築施工計算手冊》江正榮編著
3、《實用土木工程手冊》第三版楊文淵編著
4、《施工現場設施安全設計計算手冊》謝建民編著
5、《土力學與地基基礎》
6、建築品茗安全計算軟件
一、參數信息
1、基本參數
2、土層參數
3、荷載參數
4、計算系數
二、土壓力計算
1、水平荷載
1)主動土壓力系數
Ka1=tan2(45°- φ1/2)= tan2(45-12/2)=0.656;
Ka2=tan2(45°- φ2/2)= tan2(45-18/2)=0.528;
Ka3=tan2(45°- φ3/2)= tan2(45-18/2)=0.528;
Ka4=tan2(45°- φ4/2)= tan2(45-18/2)=0.528;
Ka5=tan2(45°- φ5/2)= tan2(45-18/2)=0.528;
Ka6=tan2(45°- φ6/2)= tan2(45-18/2)=0.528;
Ka7=tan2(45°- φ7/2)= tan2(45-19/2)=0.509;
Ka8=tan2(45°- φ8/2)= tan2(45-20/2)=0.49;
Ka9=tan2(45°- φ9/2)= tan2(45-20/2)=0.49;
2)土壓力、地下水産生的水平荷載
第1層土:0 ~ 2m
H1=[∑γ0h0 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ1=(0 3 3.5 4)/19=0.553m;
Pak1上=γ1H1Ka1-2c1Ka10.5=19×0.553×0.656-2×10×0.81=-9.306kN/m2;
Pak1下=[γ1(h1 H1)]Ka1-2c1Ka10.5=(19×(2 0.553))×0.656-2×10×0.81=15.622kN/m2;
第2層土:2 ~ 3m
H2=[∑γ1h1 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ2=(38 3 3.5 4)/21=2.31m;
Pak2上=γ2H2Ka2-2c2Ka20.5=21×2.31×0.528-2×15×0.727=3.814kN/m2;
Pak2下=[γ2(h2 H2)]Ka2-2c2Ka20.5=(21×(1 2.31))×0.528-2×15×0.727=14.902kN/m2;
第3層土:3 ~ 4m
H3=[∑γ2h2 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ3=(59 3 3.5 4)/21=3.31m;
Pak3上=γ3H3Ka3-2c3Ka30.5=21×3.31×0.528-2×15×0.727=14.902kN/m2;
Pak3下=[γ3(h3 H3)]Ka3-2c3Ka30.5=(21×(1 3.31))×0.528-2×15×0.727=25.99kN/m2;
第4層土:4 ~ 5.5m
H4=[∑γ3h3 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ4=(80 3 3.5 4)/21=4.31m;
Pak4上=γ4H4Ka4-2c4Ka40.5=21×4.31×0.528-2×15×0.727=25.99kN/m2;
Pak4下=[γ4(h4 H4)]Ka4-2c4Ka40.5=(21×(1.5 4.31))×0.528-2×15×0.727=42.622kN/m2;
第5層土:5.5 ~ 7m
H5=[∑γ4h4 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ5=(111.5 3 3.5 4)/21=5.81m;
Pak5上=γ5H5Ka5-2c5Ka50.5=21×5.81×0.528-2×16×0.727=41.169kN/m2;
Pak5下=[γ5(h5 H5)]Ka5-2c5Ka50.5=(21×(1.5 5.81))×0.528-2×16×0.727=57.801kN/m2;
第6層土:7 ~ 11.5m
H6=[∑γ5h5 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ6=(143 3 3.5 4)/21=7.31m;
Pak6上=γ6H6Ka6-2c6Ka60.5=21×7.31×0.528-2×16×0.727=57.801kN/m2;
Pak6下=[γ6(h6 H6)]Ka6-2c6Ka60.5=(21×(4.5 7.31))×0.528-2×16×0.727=107.697kN/m2;
第7層土:11.5 ~ 14.5m
H7=[∑γ6h6 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ7=(237.5 3 3.5 4)/22=11.273m;
Pak7上=γ7H7Ka7-2c7Ka70.5=22×11.273×0.509-2×18×0.713=100.551kN/m2;
Pak7下=[γ7(h7 H7)]Ka7-2c7Ka70.5=(22×(3 11.273))×0.509-2×18×0.713=134.145kN/m2;
第8層土:14.5 ~ 16m
H8=[∑γ7h7 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ8=(303.5 3 3.5 4)/22=14.273m;
Pak8上=γ8H8Ka8-2c8Ka80.5=22×14.273×0.49-2×22×0.7=123.063kN/m2;
Pak8下=[γ8(h8 H8)]Ka8-2c8Ka80.5=(22×(1.5 14.273))×0.49-2×22×0.7=139.233kN/m2;
第9層土:16 ~ 17m
H9=[∑γ8h8 ∑q1 ∑q1b1/(b1 2a1) ∑q1b1l1/((b1 2a1)(l1 2a1))]/γ9=(336.5 3 3.5 4)/22=15.773m;
Pak9上=γ9H9Ka9-2c9Ka90.5=22×15.773×0.49-2×22×0.7=139.233kN/m2;
Pak9下=[γ9(h9 H9)]Ka9-2c9Ka90.5=(22×(1 15.773))×0.49-2×22×0.7=150.013kN/m2;
護壁壓力計算值取最不利的情況即:p = max(Pak9上、Pak9下)= Pak9下=150.013kN/m2;
三、護壁結構計算
1、材料參數
2、護壁的受力簡圖
3、護壁壁厚及強度驗算
混凝土護壁軸心抗壓強度:
f= KpD/2t=1.65×150.013×1.8/(2×0.15)=1.485×106N/m2
f<fc=14.3×106N/m2
滿足要求!
4、護壁配筋驗算
人工挖孔樁護壁在側向壓力作用下,截面上同時作用有軸向力N和彎矩M,由于人工挖孔樁為圓心護壁且同一高度一圈作用力相同 ,可按《混凝土結構設計規範》中軸心受壓公式進行計算。另:在井壁設計中一般采用對稱配筋的方式。
環向配筋計算
N=pD/2=150.013×1.8/2=135.012×103N/m
σ=N/A=135.012/(1×0.15)=0.9×106N/m3
井壁圓環截面配筋率
μ= (σ- fc)/fy=(0.9-14.3)/270=-0.05
As=μth=-0.05×0.15×1=-0.008×106mm2
As=((h×103/Sl) 1)×Sa=352.1mm2≥As
根據構造進行配筋,環向Φ8@200,豎向Φ10@200~300mm鋼筋,上一段豎向筋插入下一段混凝土中,長度不小于100mm。
配筋符合要求
豎向配筋計算
在施工過程中,井壁支護僅承受自重,其強度足夠,一般不需驗算。但考慮人工挖孔樁現場施工情況,存在井壁下部土方被掏空的情況,而使井壁支護處于懸挂狀态,使井壁支護有可能在自重作用下被拉斷的危險,故還需驗算井壁支護豎向受拉鋼筋。本計算書将人工挖孔樁護壁視為等截面,計算公式如下:
Smax=G0/4
Smax---井壁支護最大垂直拉力
G0---井壁混凝土支護自重,G0=π×D×t×H×24
豎向鋼筋承載力As=Smax/fy=(π×D×t×H×24)/(4×fy)=(3.14×1.8×0.15×17×24)/(4×270×103)=320.28mm2
As=(π×D×103/Sl)×Sa=1861.1mm2≥As
配筋符合要求
,